Project Overview
As the main contractor, Calder Group is responsible for all aspects of this architecturally designed warehouse and office space project in Wanaka, from concept through to completion.
Calder delivered feasibility studies, resource and building consents, civil and structural engineering, architectural design and drawings and is currently leading project management and construction.
Project Stats
The building has 2200m2 of warehousing plus an additional and three two level offices totalling approximately 880m2 with 43 car parks and a total site area of 5095m2.
Project Team
The Calder team on this project consists of 40 specialists including architectural technicians and detailers to steel fabricators, engineers and carpenters.
Materials
Calder’s concrete factory in Cromwell), structural steel (supplied by Calder’s high-tech steel pre-fabrication plant in Tapanui, Otago), Colorsteel iron roof, Alucobond cladding, office construction – timber framed with gib walls. Carparking with precast concrete retaining walls.
Project Duration
12 months